Home  /  About

About Restumping Mornington Peninsula

What this site is, who is on the other end of the phone, how the rule and ground pages are written, and what happens after you send a few photos of a house that has moved.

What this site is

This site connects Mornington Peninsula home owners, holiday-house owners, landlords and buyers with local restumping and underpinning contractors. When an enquiry comes in, it goes to a builder who works on the Peninsula and holds the registration the job needs. The site is not the builder. It does not quote, dig or sign anything; it explains what the job involves and puts you in touch with someone who can do it.

All work is carried out by appropriately licensed contractors. In Victoria that means a builder registered with the Building and Plumbing Commission, which for restumping and reblocking applies regardless of the value of the work.

A lot of the people who write in do not live here. They own a house at Rye or Blairgowrie or Somers that the family uses over summer and a few long weekends, and the first they hear of a problem is a neighbour ringing about a sagging verandah, or a building report on a sale, or the back door that would not shut on the first trip down after winter. The pages are written with that owner in mind as much as the one who lives in Mornington year round.

Why the guides are here

A restump is a week or two under a house surrounded by rules most people meet once. The Building Act and the permit that comes from a private building surveyor rather than the Shire. The registration that applies at any job value. The written contract at $10,000 and the Home Warranty insurance at $20,000. Report and consent if the lot is flood prone, consent before digging near an easement, a landslide risk assessment if the block is in an erosion overlay, a word with the heritage team if it is in a heritage precinct. None of it is hard, but it is scattered across the Commission, Consumer Affairs and the Shire's website, and a first-time owner has no way to know which bits apply to a weatherboard at Capel Sound.

Then there is the ground. Within one Shire the houses sit on deep calcareous dune sand at the Nepean end, dune sand with a cemented pan around Rosebud, peat at Tootgarook, sandy loam over waterlogging clay around Hastings and Baxter, and shallow gritty soil over granite on Arthurs Seat and Mount Martha. What stump goes back in, and how deep, is not the same question in Portsea as it is in Bittern.

The pages here put the permits, the thresholds and the ground in one place, in plain words, with a link to the source wherever a figure or a rule is stated.

If a page here stops one set of untreated timber stumps going back into the sand at Rye, it has done its job.

How the rule pages are written

  • Everything is dated. Each page describing a rule says the month it was written, and the fees quoted carry the year of the schedule they came from, which at the time of writing is 2025-26.
  • The source is linked. The Building and Plumbing Commission for permits, registration and insurance. Consumer Affairs Victoria for contracts. Mornington Peninsula Shire for its building fees, report and consent, easements, heritage and erosion overlays, termite designation and landslide information. Victorian Resources Online for the soils. The Bureau of Meteorology for rainfall. The ABS for the housing numbers. The legislation itself for the Acts and Regulations.
  • Where this site and the source differ, the source is right. That is stated in the dated box on each rule page, and it is meant.
  • Figures are quoted, not promised. Thresholds, fees and dates change. The Home Warranty threshold moved from $16,000 to $20,000 on 1 July 2026, and the landslide overlay was cut from about 33,000 properties to about 6,000 on 19 October 2026. The pages say what the published figure was and point you at the body that sets it.
  • Unverified things are said to be unverified. This site has not found a published site classification for any Peninsula town, has not found the Shire's 2026-27 building fee schedule, and does not know whether your particular lot is still in EMO7. It says so rather than guessing.
  • You are pointed at the right person. A restumper is not the person to design underpinning, classify your soil, assess landslide risk or decide a heritage application. Those are the engineer, the geotechnical laboratory, the Shire's planners and the heritage team.
  • Nothing here is legal advice.

What you will not find here

  • No testimonials or star ratings.
  • No gallery of past jobs. Photographs are illustrative only and do not depict specific jobs. The house in the picture is not your neighbour's.
  • No promise about the ground. The site class of a block comes from a geotechnical test, not from a web page, and not from the fact that the house next door is on sand.
  • No prices for the work. Two houses the same size, one in Tootgarook and one on a slope at McCrae, can be priced a long way apart. The cost guide explains what moves the number. Shire and surveyor fees are quoted where they are published.
  • No claim that a rule does not apply. Whether your house needs a planning permit as well as a building permit depends on the overlays on the lot, and the pages say to ask the Shire rather than telling you it is fine.

What to expect when you make contact

  1. You give the town, what the house sits on if you know, what you have noticed inside, and a few photos. If you are not on the Peninsula, say who holds the key.
  2. The overlays on the property are checked from the address: heritage, erosion, bushfire, flood prone land.
  3. A builder comes back to you with questions about the subfloor and the access, then a price range or a time to look.
  4. A subfloor inspection, a written quote, the contract, the building permit and any report and consent the lot needs, in that order.
  5. If a settlement, a building report or a builder's start date is driving it, say so up front. It changes what gets lodged first.

Towns covered

Mornington, Mount Eliza, Mount Martha, Dromana, Safety Beach, McCrae, Rosebud, Capel Sound, Rye, Tootgarook, Blairgowrie, Sorrento, Portsea, St Andrews Beach, Hastings, Somerville, Tyabb, Baxter, Bittern, Crib Point, Somers, Balnarring, Red Hill, Flinders, Shoreham, Merricks, Main Ridge, Moorooduc, Tuerong and Boneo, along with the hinterland and the smaller settlements between them across the whole of Mornington Peninsula Shire, from Mount Eliza on the Melbourne side to Portsea at the end of the Nepean peninsula and Somers and Crib Point on Western Port.

What this site cannot do

It cannot issue a building permit, design underpinning, classify soil, assess landslide risk or treat termites. Those sit with a registered building surveyor, a structural engineer, a geotechnical laboratory, a qualified engineer or geologist and a licensed pest controller. It cannot tell you whether your lot is flood prone or in a heritage or erosion overlay; the surveyor and the Shire's property information certificate do that in writing. The site exists to explain the rules and the ground, and to put you in touch with a registered builder who can do the restump.

Written October 2026

Check the current rules before you rely on this

The rule pages on this site summarise how restumping is regulated in Victoria for Mornington Peninsula property owners. It describes the rules in general terms as they stood in October 2026. Standards, forms, thresholds and fines change.

The authoritative sources are Building and Plumbing Commission practice note BP-01, when is a building permit required, Building and Plumbing Commission (as the VBA) on registration being required for restumping and reblocking at any value, Consumer Affairs Victoria, preparing a major domestic building contract, Mornington Peninsula Shire, building services and the statutory building team and Mornington Peninsula Shire contact details. Where anything here differs from those sources, they are right and we are not.

We are not building surveyors, engineers, planners or lawyers. For what applies to your house, ask a registered building surveyor or ring Mornington Peninsula Shire on 1300 850 600.

Accurate at the time of writing, October 2026. Always check the source before relying on it.

Questions

Common questions

Is Restumping Mornington Peninsula a building company?

No. It is a site that connects people on the Mornington Peninsula with local restumping and underpinning contractors. Enquiries are passed to a builder who works in the area and holds the registration the job needs. The site itself does not quote, contract or carry out any work, and nothing on it should be read as a quote.

Are the contractors registered?

All work is carried out by appropriately licensed contractors. In Victoria a builder in the business of restumping or reblocking must be registered with the Building and Plumbing Commission regardless of the job value; the usual $10,000 threshold does not apply to this work. Ask for the registration number with your quote and check it on the Commission's register before you sign.

Do you issue the permits?

No. Building permits come from a private registered building surveyor. Report and consent for flood prone land, easement consents and property information certificates come from Mornington Peninsula Shire's statutory building team, and planning permits from the Shire's planning services. Contractors reached through this site lodge the paperwork and work to it; the site does not.

Which areas do you cover?

The whole of Mornington Peninsula Shire: Mornington, Mount Eliza and Mount Martha; Dromana, Safety Beach, McCrae, Rosebud, Capel Sound, Rye, Tootgarook, St Andrews Beach and Blairgowrie; Sorrento and Portsea; Hastings, Somerville, Tyabb, Baxter, Bittern, Crib Point and Somers; and Balnarring, Red Hill, Flinders, Shoreham, Merricks, Main Ridge, Moorooduc, Tuerong and Boneo in between.

Are the photos on this site real jobs?

No. Photographs on this site are illustrative only and do not depict specific jobs. They show the kind of work and the kind of house, a weatherboard in Mornington or a fibro at Rosebud, not a particular address or a particular contractor's job.

Why are there no prices on the site?

Because the price depends on the number of stumps, the clearance, whether the ground is sand, clay or granite, the state of the bearers, the access down the side of the block and the permits the lot needs, and a single figure would be wrong for most houses. The cost guide explains how a restump is priced. Published Shire fees are quoted with their year.

Where do the rules on this site come from?

From the Building Act 1993 and Building Regulations 2018, the Building and Plumbing Commission, Consumer Affairs Victoria and the Domestic Building Contracts Act 1995, Mornington Peninsula Shire and the Mornington Peninsula Planning Scheme, and for the ground from Victorian Resources Online, the Bureau of Meteorology and the ABS. Each rule page links to its sources and carries the month it was written.

How quickly will someone get back to me?

Enquiries are passed on as they arrive. If a settlement, a building report or a builder's start date has put a date on it, put that in the message so it can be scheduled around. If you are only on the Peninsula on certain weekends, say which ones, and whether a neighbour or an agent can open the house in between.

Next step

Send a few photos and a town

The worst room, the outside of the house and, if you can get to it, a stump or two under the floor. That is usually enough for a price range before anyone visits.